E-Rate 470 Application Detail |
Applicant Information | Application Information |
---|---|
Technology Leadership High School | 470-Form #: 200016359 |
10500 RESEARCH RD SE | Applicant Form ID: Technology Leadership High School - C2 |
ALBUQUERQUE, NM 87123-3400 | Completed Date: 01-23-20 |
Applicant Type: SCHOOL | Funding Year: 2020 |
Eligible Sites: 1 | Allowable Contract Date: 02-20-20 |
Entity Number: 17000595 |
|
|
|
|
|
|
|
Tech_Leadership_Cat2 470 Narrative.docx |
Tech_Leadership_Cat2_SOW.docx |
Tech_Leadership_Building Map.docx |
Tech_Leadership_Cat2_Cost_Sheet.xlsx |
Narrative | |
Technology Leadership High School currently has a set up of wifi access points and a variety of mixed network equipment and is looking to replace the access points for optimized connectivity and hardware equipment, along with additional cabling ( Drops ) as needed. The school is open to solutions to address the connectivity issues with the wireless access points stated in the SOW, and to alleviate issues in order to maximize students' abilities to complete tasks. Please see attached documents. Vendors must respond using the cost response sheet (Excel File) provided. Also attached to the 470, the school has uploaded a network map and building drawing. This is provided to help vendors have what they need to be able to provide quality proposals. |
# | Function | Manufacturer | Other | Entities | Quantity | Unit | Install? | RFP? |
---|---|---|---|---|---|---|---|---|
1. | Firewall Service and Components | Barracuda or equivalent | 1 | Each | Yes | Yes | ||
2. | Switches | Meraki or equivalent | 2 | Each | Yes | Yes | ||
3. | WAP | Meraki or equivalent | 12 | Each | Yes | Yes | ||
4. | UPS/Battery Backup | No Preference | 8 | Each | Yes | Yes | ||
5. | Racks | No Preference | 1 | Each | Yes | Yes | ||
6. | Cabling | Cisco Systems or equivalent | 1 | 3000 | Feet | Yes | Yes |
# | Function | Manufacturer | Other | Entities | Quantity | Unit | Install? | RFP? |
---|---|---|---|---|---|---|---|---|
1. | Firewall Service and Components | Barracuda | 1 | 1 | Each | No | Yes | |
2. | Switches | Meraki | 1 | 2 | Each | No | Yes | |
3. | WAP | Meraki | 1 | 12 | Each | No | Yes | |
4. | UPS/Battery Backup | No Preference | 1 | 8 | Each | No | Yes | |
5. | Racks | No Preference | 1 | 1 | Each | No | Yes | |
6. | Cabling | Cisco Systems | 1 | 1000 | Feet | No | Yes |
Category 2 Budget
For the 2021-2025 C2 budget cycle, spending constraints are applied at the district/system level, rather than at the individual school/library level (see FCC Order 19-117 for an explanation of current budget calculations). | Category 2 Five-Year Budget, 2021-2025 | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
BEN | Entity Name | Entity Type | Budget Algorithm | Per-Site Basis Diff. | # Sites | Enrollment | Square Footage | Pre-Discount Budget | 2021 Spending | 2022 Spending | 2023 Spending | 2024 Spending | 2025 Spending | Other Spending | Total C2 Spending | Remaining Budget |
17000595 | TECHNOLOGY LEADERSHIP HIGH SCHOOL | School | Independent School | 0.00 | 0 | 274 | 0 | $45,758.00 | $17,601.12 | $17,988.00 | $8,084.52 | $0.00 | $0.00 | $0.00 | $43,673.64 | $2,084.36 |
Per FCC Order 19-117, the 5-year Category 2 Budget trial period was extended to include a sixth year. Pre-Discount Budget, Total Spending, and Remaining Budget columns include both 5-year (2015-2019) figures (top) and 6-year (2015-2020) figures (bottom). | Category 2 Budget History, 2015-2020 (Trial Period) |
|||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
BEN | Beneficiary Name | Type | U/R | Enrollment | Square Footage | Pre-Discount Budget | 2015 Spending | 2016 Spending | 2017 Spending | 2018 Spending | 2019 Spending | 2020 Spending | Total Spending | Remaining Budget |
17000595 | Technology Leadership High School | School | Urban | 312 | 0 | $49,816.74 $61,036.56 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $41,055.65 | $0.00 $41,055.65 | $49,816.74 $19,980.91 |
TOTAL | 312 | 0 | $49,816.74 $61,036.56 |
$0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $41,055.65 | $0.00 $41,055.65 |
$49,816.74 $19,980.91 |
Funding History
Year 471 - 470 |
Service | Service Provider | SPIN | 471 # | FRN | Contract Expiration |
Funded | SP Award | Discount Percent |
Request/ Commited |
Utilized | %Utilized | ||||
2024 - 24 | IA | Unite Private Networks, LLC | 143029868 | 241033693 | 2499048616 | 2027-06-30 | Pending | 10,428 | 90% | 9,385 | ||||||
Total Funded 2024 | 0 | 0 | 0 | |||||||||||||
2023 - 23 | MIB | Comnet Consulting, Inc. | 143052306 | 231024428 | 2399033960 | 2024-06-30 | Funded | 8,085 | 85% | 6,872 | 6,234 | 90.7% | ||||
2023 - 23 | IA | Unite Private Networks, LLC | 143029868 | 231028017 | 2399039845 | 2024-06-30 | Funded | 22,483 | 90% | 20,235 | 16,716 | 82.6% | ||||
Total Funded 2023 | 30,567 | 27,106 | 22,950 | |||||||||||||
2022 - 22 | MIB | Comnet Consulting, Inc. | 143052306 | 221004888 | 2299004940 | 2023-06-30 | Funded | 17,988 | 85% | 15,290 | 14,961 | 97.8% | ||||
2022 - 20 | IA | Unite Private Networks, LLC | 143029868 | 221002807 | 2299002429 | 2023-06-30 | Funded | 13,373 | 90% | 12,036 | 11,169 | 92.8% | ||||
Total Funded 2022 | 31,361 | 27,326 | 26,129 | |||||||||||||
2021 - 21 | MIB | Comnet Consulting, Inc. | 143052306 | 211025136 | 2199035918 | 2022-06-30 | Funded | 17,601 | 85% | 14,961 | 14,961 | 100.0% | ||||
2021 - 20 | IA | Unite Private Networks, LLC | 143029868 | 211008153 | 2199009270 | 2023-06-30 | Funded | 13,373 | 90% | 12,036 | 11,169 | 92.8% | ||||
Total Funded 2021 | 30,974 | 26,997 | 26,129 | |||||||||||||
2020 - 20 | IC | Rising Sun Technologies Electrical LLC | 143051209 | 201018556 | 2099025378 | 2021-06-30 | Funded | 41,056 | 80% | 32,845 | 32,845 | 100.0% | ||||
2020 - 20 | IA | Unite Private Networks, LLC | 143029868 | 201010629 | 2099012727 | 2023-06-30 | Funded | 13,373 | 80% | 10,699 | 9,767 | 91.3% | ||||
Total Funded 2020 | 54,429 | 43,543 | 42,612 |
Copyright © 2006-2024 QueryBob, Inc. |